Section 6 - Work Holding - 41Microrouter CNC Machine User's Manual
6: Assembling the Work Holding Clamp Rails
To assemble each clamp rail:
1) Place the long, deep, U shaped section upside down, on a flat
workbench, so the bottom of its channel is facing upwards. Place
the shorter, shallow, U shaped section on top, so the bottom of its
channel is facing down. Position this U shaped section so the
single holes at each end align with the inner thread holes of the
lower U shaped section.
2) Insert the long part threaded M8 allen headed bolts through the
two holes in the upper U shaped section and carefully fit them
into the matching threaded holes in the lower U shaped section.
3) Carefully fit the short M8 allen headed bolts into the remaining
threaded holes, one at each end of the lower U shaped section.
Zobrazit stránku 40